Skip Ribbon Commands
Skip to main content

Ongoing Plans & Projects

Refinery Projects
Pipelines & Related Facilities Projects
Jetty Projects
Retrofitting Projects

 Retrofitting Projects

Study and implementation of retrofitting projects against earthquakes for Maroon-Isfahan pipelines and pumping stations across the country​


A- Explanation of services on vulnerable studies and making Maroon-Isfahan oil pipelines resistant:

Collection and preparation of existing information:
Includesstudy of plans, auditingrecords and evaluation of current situation and comparison of them tocurrent plans; in absence of plans, preparing as-built documents (of existing conditions) and inspection of pipelines and if necessary,performingnon-destructive analysis.
Conducting earthquake danger analytical studies (Risk analysis):
Includes preparation of acceleration spectrum for design in stone layer and on ground surface with respect to completion of existing geotechnical information and conducting any study that will lead to completion of earthquake risk analysis
Vulnerability studies:
a. Qualitative and quantitative analysis of all pipeline, fittingsand connections as a result of all induced focal, quake and dynamic forces and the impact of the product on well-credited scientific methods, global standards, with linear or non-linear methods, and using relevant software and applying acceleration spectrum derived from analysis of earthquake risk (necessary in surveying the impact of wave)
b. Studying the structure and all elements including member of focal and side carriers, junctions and foundations as a result of applying all the forces concentrated on the structure (either the focal, vibrating and dynamic forces) per article of association no. 2800 and national construction regulations as well as all the world well-credited organizations and studying all non-structure elements and filler elements through linear and non-linear methods, using relevant software by applying the spectrum of acceleration gained byquake risk analysis.
c. Studying collapse and sliding of pipelines and current structures at the time of possibleearthquake 
d. Vulnerable points determination based on the accelerations gained by analysis of earthquake risk

Retrofitting studies:
It includes presentation of methods of encountering vulnerable points and selection of appropriate solutions to make facilities resistant through qualitative and quantitative methods and using mathematical and analytic methods along with execution plans and their details in a way that it will make all hydrocarbon pipelines and their structures resistant and address all the incoming (focal, vibrating and dynamic) forces. The present project to study making Maroon-Isfahan pipelines resistant is on the agenda and the retrofitting project will be commissioned once the study is complete.

General specifications, boundary and site of work:
Maroon-Isfahan pipeline begins from Maroon 1 pumping station and ends in products Transfer Center close to Isfahan Refinery after passing through 430 kms from 6pumping stations. It sends feedstock to Isfahan and Tehran refineries. 
The 30 inch in diameter pipeline is buried inside the ground on Ahvaz-Isfahan way, passing through mountainous area and crossing quake faultlines. It enters Karoon dam area after 159 kms and after a change in the path laid down in the years Karoon 3 Dam was constructed (19 kms variant) and passing through heights close to Karoon dam lake, it reaches Karoon 4 dam zone with about 50 meter high beta tranches and harsh steeps. After passing limits of Karoon 4 dam, it ends up in Isfahan refinery.
Project manager: Hossein Kazem

B- Details of study and execution of pumping stations retrofittingnationwide: 
Implementation of the project for the purpose across the country fall into three groups: 
Group A: This part includes 20 pumping stations (products transfer center)

​​Item​​

​Pumping/De-pressurizing stations​

​Item

Pumping/De-pressurizing stations​

​Item​

Pumping/De-pressurizing stations​
​1​Karaj facilities​8​Qarachaman pumping station ​15​Paytagh pumping station
​2​Qavin pumping station​9​Zanjan facilities ​16​Qotbabad pumping station
​3​Roudbardepressurizer​10​Miane facilities ​17​Mehraran pumping station
​4​Rasht facilities   ​11​Maraghe facilities ​18S​irjan facilities​
​5​Eshtehard pumping station​12​Miandoab pumping station​19​Rafsanjani facilities
​6​Abhar pumping station​13​Orumieh facilities  
​7​Idelou pumping station​14​Naftshahr pumping station


Group B: This part includes 19 pumping stations (products transfer center)

Item​​

​Pumping/De-pressurizing stations​

​Item

Pumping/De-pressurizing stations​

​Item​

Pumping/De-pressurizing stations​
​1Semnan pumping station ​8​Mashhad facilities ​15​Orim pumping station
​2Damghan facilities​9Gorgan facilities​16Golpol pumping station
​3Shanroud pumping station​10Gonbad facilities ​17Sari pumping station
​4​Sabzevar pumping station​11Aliabad depressurizer​18S​irjan facilities​Neka pumping station
​5Neishabour facilities​12Varsazdepressurizer​19​Noshahr pumping station 
​6TorbatHeidarieh facilities  ​13​Lajimdepressurizer 
​7EmamTaqi facilities​14Moghanakdepressuirizer


Group C: This task includes 19 pumping stations (products transfer center) ​

Item​​

​Pumping/De-pressurizing stations​

​Item

Pumping/De-pressurizing stations​

​Item​

Pumping/De-pressurizing stations​
​1Sarab facilities​8Chamran pumping station​15Dehdez pumping station
​2​Hamedan facilities​9Lorestani pumping station​16​Izeh pumping station
​3 Razan pumping station​10​KhordVaraq pumping station​17​Baghmolk pumping station
​4​   Pol baba pumping station​11​40 Miles Mahshahr facilities​18Ramhormoz pumping station
​5Tang Fanni pumping station  
​12​Islamabad facilities​19Omidieh pumping station​
​6Asar pumping station
​13​Ab Nil facilities
​7​Abhar pumping stationSabzab pumping station​14​Gandomkar pumping station​​


​In the current project, retrofitting studies for 54 pumping is completed; and the execution of retrofitting studies for Tehran district, consisting Karaj, Qazvin, Roudbar, Rasht and Nowshahr, is on the agenda.​


Vulnerability studies and retrofitting existing hydrocarbon storage

Summary of project: 

Qualitative (analytical) and quantitative vulnerability and retrofitting studies in accordance with latest international standards and methods, preparation of execution plans and other necessary documents to offer most economical methods of retrofittingof 12 existing hydrocarbon storage including:  
o Liquid hydrocarbon storagefacilities ofNezamieh, Yassouj, Mashahd No. 2, Khorramabad, Birjand, ShahreKord, Qeshm, Sarab, and Ardebil.
o Liquefied gas storage facility of Sang Bast, 18,000-tonof Rey, Bandar Abbas.
o 16 jet fuel centers including, Mehrabad, Mashhad, Isfahan, Shiraz, Tabriz, Zahedan, Kerman, Bandar Abbas, Yazd, Rasht, Ahvaz, Sari, Abadan, Orumieh, Boushehr, and Qeshm. 
Studies to strengthen pipelines and pumping stations nationwide.


All Rights Reserved By NIOEC.
Hit Counter: 43981
Gasoline
Fuel Oil
Opec
WTI
Brent
  • Home Page
  • RSS
  • Mobile Version
  • Persian site