Project Title Construction Project of Sabzab / Rey Sour Crude Oil Transmission Pipeline
Goals

Transfer of sour crude oil from North Dezful oil fields at the rate of 450,000 barrels per day for refining to Kermanshah (Anahita), Arak and Tehran oil refineries with the construction of a 620 km long pipeline

Job Description
  • Construction of a 102 km pipeline with a diameter of 30 inches with a transfer capacity of 450,000 barrels per day from Sabzab oil transfer center to Tang-e Fani oil transfer center (for transfer to Anahita oil refinery in Kermanshah)
  • Construction of a 239 km pipeline with a diameter of 26 inches with a transfer capacity of 295,000 barrels per day from Tang-e Fani oil transfer center to Shazand oil transfer center (for transfer to Arak oil refinery)
  • Construction of a 279 km pipeline with a diameter of 18 inches with a transfer capacity of 105,000 barrels from Shazand oil transfer center to Rey terminal oil transfer center (for transfer to Tehran oil refinery)
  • Construction of 6 intermediate oil transfer centers including Sabzab in Andimeshk, Tang-e Fani in Pol-e Dokhtar of Lorestan, Asar in Pol-e Dokhtar of Lorestan, Pol Baba in Khorramabad, Razan in Khorramabad and Shazand next to Arak oil refinery
  • Construction of pressure reducing station in Qom and Rey terminal facilities in Tehran oil refinery
  • Construction of power transmission lines and related electrical substations in Sabzab, Tang-e Fani, Asar and Razan oil transfer centers
  • Construction of two equalization tanks of 240,000 barrels in Sabzab

 

  • Engineering (E): Preparation of documents and technical specifications, procurement engineering, documents and maps required for project implementation and commissioning: 3,352 documents
  • Purchase and procurement of goods and materials (P): Procurement of 152 packages
  • Executive operations (C):
  • Construction of a 620 km pipeline with 18, 26 and 30 inches in diameter with a transfer capacity of 450,000 barrels per day
  • Construction of 6 oil transfer centers, 1 pressure reducing station and 1 terminal
  • Construction of 63 kV power transmission lines for Tang-e Fani and Asar oil transfer centers with a length of 36 km, and 132 kV for Sabzab oil transfer center with a length of 7 km
Title Capital Rial Capital: 108،000 billion Rials

Foreign Capital:
Employer NIOEC
Project Managment NIOEC
Contractors Ghadir consortium (Nasr Misagh Ahvaz Co., Setiran Co., Nardis Co.)
Consultant
Contract Type EPC
Last Update Page: 5/6/2024 1