Project Title Construction Project of Mehraran / Rafsanjan Pipeline with Sirjan Pipeline Branch Section 2 of Construction Project of Bandar Abbas / Sirjan / Rafsanjan Pipeline
Goals

Transfer of 300,000 barrels per day of petroleum products, including gasoline, kerosene and diesel oil from the products of the Persian Gulf Star refinery to the central regions of the country

Job Description
  • Construction of a 26-inch pipeline with a capacity of 300,000 barrels per day for the transfer of petroleum products from Mehraran oil transfer center to Rafsanjan terminal
  • Construction of an 8-inch pipeline with a capacity of 35,000 barrels per day as the ‘Sirjan branch’ to feed the existing oil storage in Sirjan
  • Detailed design and engineering, compilation of manuals for engineering, commissioning, operation and maintenance
  • Supply and procurement of goods and materials required for the project
  • Executive operations of pipeline construction, construction operations, installation and commissioning of two-way valves and other equipment until the completion of the project, pre-commissioning, commissioning and elimination of one-year defects

 

Workload Details

  • Engineering (E): Preparation of documents and technical specifications, procurement engineering, documents and maps required for project implementation and commissioning: 315 documents
  • Purchase and procurement of goods and materials (P): 64 items
  • Executive operations (C):
  • Construction of 20 kV power transmission line with a length of 35 km to cathodic protection stations
  • Construction of 26-inch diameter pipeline with a length of about 219 km from Mehraran oil transfer center to Rafsanjan terminal
  • Construction of 8-inch diameter pipeline with a length of about 24 km branching from the main pipeline to feed the oil storage in Sirjan
  • New road construction (ROW) with a length of about 70 km
  • Construction of 17 two-way valve stations
  • Construction of a fiber optic cable with a length of about 220 km for leak detection and data transmission systems
  • Construction of 18 main intersections with roads and seasonal rivers
  • Earthworks: 2 million cubic meters

Supply of 220,000 meters of API5LX60 pipe with an approximate weight of 37,000 tons with fusion bonded epoxy (FBE) coating for the project

Title Capital Rial Capital: In Local Currency: 1,640 billion Rials

Foreign Capital: In Foreign Currency: € 45 million
Employer NIOEC
Project Managment NIOEC
Contractors Consortium of Kerman Jahad-e-Nasr Co. & Sisakht
Consultant Pars Consulting Engineers
Contract Type EPC
Last Update Page: 5/6/2024 1