· Acceleration and facilitation of the efficient and sustainable supply and distribution of fuel required in Sistan and Baluchestan Province
· Utilization of the pipeline as an alternative to road transportation and increasing the share of petroleum product transfer through pipelines
· Reduction of road traffic, leading to lower fuel consumption, savings, and decreased operational costs
* Mitigation of road hazards and reduction of environmental impacts
Execution of engineering, procurement, construction, and financing of the project, which includes a 525-kilometer pipeline with a capacity of 60,000 barrels per day along the Kerman/Zahedan route, the construction of two pumping stations in Kerman and Kahurek, and a terminal in Zahedan.