Safe and continuous supply of petroleum products required in the northwestern and northeastern regions of the country as well as sustainable transportation of petroleum products to Tehran and its suburbs
- Construction of 20-inch X60 grade crude oil pipeline between Cheshmehshour to Eshtehard oil transfer center with a transfer capacity of 165,000 barrels per day in the form of burial with FBE coating and construction of Cheshmehshour station - Construction of 24-inch X60 grade product pipeline between Cheshmehshour station to Eyvanki oil transfer center with a transfer capacity of 300,000 barrels per day in the form of burial with FBE coating and construction of Eyvanki station - Construction of 26-inch X60 grade product pipeline between Cheshmehshour station to Palangabad station with a transfer capacity of 320,000 barrels per day in the form of burial with FBE coating and construction of Palangabad station - Construction of equipment related to branches, intelligent leak detection system and control and monitoring system for all routes Cheshmehshour / Eshtehard, Cheshmehshour / Eyvanki and Cheshmehshour / Palangabad - Construction of all relevant two-way valve stations and cathodic protection rooms - Construction of two strands of fiber optic cable for Cheshmehshour / Eshtehard, Cheshmehshour / Palangabad and Cheshmehshour / Eyvanki routes with all connections and relevant intermediate stations - Preparation of maps and land acquisition documents - Activities in the field of engineering services, supply of materials and equipment, construction operations, installation, commissioning and operation based on documents and approved plans and current standards and instructions approved by the Ministry of Petroleum in accordance with the job description