Project Title Construction of Rafsanjan/Birjand/Mashhad Products Transfer Pipeline (Tabesh Pipeline)
Goals

The construction project of 22 and 18-inch pipelines in Rafsanjan, Birjand, and Mashhad (Tabesh Pipeline) with a length of 950 km, which is being built in order to provide sustainable energy and fuel needed in the eastern and northeastern regions of the country and also reduce the cost of transporting petroleum products to the mentioned areas with a capacity of 130 to 156,000 barrels per day (diesel and gasoline), is on the agenda.

Job Description

This project includes five projects as follows: 1- Area 1: Construction of a pipeline with a length of 250 km (Rafsanjan - Cheshmeh Shoor); 2- Area 2: Construction of a 250-km pipeline (Cheshmeh Shoor - Birjand) and Cheshmeh Shoor pigging station; 3- Area 3: Construction of a 300-km pipeline (Birjand - Torbat Heydariyeh); 4- Area 4: Construction of a 150-km pipeline (Torbat Heydariyeh - Mashhad) and construction of Torbat Heydariyeh, Imam Taghi and Mashhad terminal facilities; 5- Construction of pumping stations in Rafsanjan and Birjand Implementation of this project includes: 1- Construction of a 22-inch pipeline between Rafsanjan Pumping station and Imam Taghi Pumping Facility with an approximate length of 900 km and an 18-inch 5 L-X60 pipeline from Imam Taghi Facility to Mashhad Terminal with an approximate length of 50 km with FBE coverage. This line will be equipped with intermediate facilities such as valves, cathodic protection system and an intelligent leak detection system. 2- Construction of a new 22-inch line pumping station will be required at the site of the existing pumping station in Rafsanjan with a nameplate capacity of 130,000 barrels of gasoil per day, including installation of main pumps, booster pumps, filters, pigging transmitter, anti-corrosion injection system as well as other systems and ancillary facilities along with the required buildings and structures; 3- Construction of facilities for receiving and sending Cheshmeh Shoor Pigging equipment at kilometer 245 of a 22-inch line; 4- Construction of the new 22-inch Birjand pumping station at Kilometer 500 of the pipeline with an installed capacity of 130,000 barrels of diesel per day, which includes installation of main pumps, booster pumps, filters, balance tanks, pigging equipment, anti-corrosion injection system and implementation of other systems and ancillary facilities along with buildings and structures. 5- Construction of an offshoot station in the existing facilities of Torbat-e Heydariyeh terminal at Kilometer 800 of a 22-inch pipeline which includes equipment for sending and receiving filter pigs, metering system and other ancillary and building requirements. 6- Construction of an offshoot station in the existing facilities of Imam Taghi at Kilometer 950 of the 22-inch pipeline which includes equipment for sending and receiving filter pigs and other ancillary necessities and buildings. 7- Construction of an 18-inch pipeline end facilities in the existing terminal facilities in Mashhad which include equipment for sending and receiving filter pigs, metering systems and other ancillary and building requirements. 8- Supply of electricity to pumping stations, including: construction of a two-circuit transmission line and 132/6.3 KV new Birjand pumping station, development of existing pump and substation electrical facilities in Rafsanjan and supply of electricity to other terminals of Torbat Heydariyeh, Imam Taghi and Mashhad through equipment installation and development of existing facilities and buildings.

Title Capital Rial Capital:

Foreign Capital: The initial estimate of the project is a total of €600 million.
Employer NIOEC
Project Managment NIOEC
Contractors
Consultant
Contract Type EPC